Project experience

Selected projects

A selection from more than 30 projects delivered by our principal, working for contractors and for owners.

Data center

AWS PNE 105, Electrical and Fire Alarm

E-J Electric Installation Co.
Morrisville, Pennsylvania, USA

Role
Contractor's scheduler for the electrical scope
What we did
Electrical baseline, weekly and monthly updates, completion forecasts and early warning on trade interfaces across 12 room groups and L1 to L5 commissioning.
Result
Baseline, monthly updates and manpower histogram accepted.
Data center

Lancaster LPE-01 Data Center Campus, Electrical Package

E-J Electric Installation Co.
Lancaster, Pennsylvania, USA

Role
Contractor's scheduler for the electrical scope
What we did
Baseline for four GPU halls, 36 electrical rooms and MV rooms, with testing sequenced through L3, L4 and L5 commissioning. Weekly and monthly updates and forecasts.
Result
Baseline, monthly updates and manpower histogram accepted.
Metro / transit

MTA ADA Packages 12 and 13, 12 Subway and SIR Stations

MTA Construction & Development
Brooklyn, Queens, Manhattan and Staten Island, New York

Role
General contractor's scheduler
What we did
Design-build baseline covering 30/60/90% design, permits, long-lead elevators and switchgear, and station construction through commissioning. Supported the risk analysis.
Result
Baseline accepted.
Metro / transit

Perth Amboy Station Accessibility Improvements

NJ Transit
Perth Amboy, New Jersey

Role
Owner-side schedule reviewer
What we did
Monthly review of contractor updates, recovery schedules and time impact analyses for two new 965 ft platforms and four elevators, phased by track.
Result
Flagged schedule manipulation in the contractor's updates to the owner.
Transit facility

Green Line Riverside VMF Upgrades (CMAR)

MBTA
Newton and Somerville, Massachusetts

Role
Owner-side scheduler and reviewer
What we did
Consolidated schedule combining owner milestones, the designer schedule and the CMAR construction schedule, with monthly reports, update and TIA reviews, and what-if analysis for iGMP packages.
Line structure

Line Structure Repair and Storm Water Mitigation, 7th and 8th Avenue Lines

MTA Construction & Development / NYC Transit
Upper Manhattan, New York

Role
Scheduler
What we did
Baseline schedule for tunnel structure repairs on two subway lines, with weekend and multi-week General Order track outages built into the logic.
Bridge

Component Repair and Rehabilitation of 9 Bridges

NYC Department of Transportation
Brooklyn, Queens and the Bronx, New York

Role
Owner-side schedule reviewer
What we did
Monthly review of contractor updates, recovery schedules and time impact analyses across nine bridges with staged traffic control.
Result
Flagged schedule manipulation in the contractor's updates to the owner.
Boiler / mechanical

Carver Houses Boiler and Hot Water Heater Replacement

New York City Housing Authority (NYCHA)
Manhattan, New York (13 buildings)

Role
Owner-side schedule reviewer
What we did
Monthly review of contractor updates, recovery schedules and time impact analyses for building-by-building replacement with temporary boilers kept in service.
Result
Flagged schedule manipulation in the contractor's updates to the owner.
Civil works

Citywide Raised Crosswalks, 127 Sites (Design-Build)

NYC Department of Transportation
All five boroughs, New York City

Role
Scheduler
What we did
Preliminary baseline for 127 sites in 7 packages, covering investigations, design, utility relocation, ADA ramps, signals and resurfacing.
Aviation

Airport Traffic Control Tower Design Competition, Phase III

Federal Aviation Administration (FAA)
Key West, Florida

Role
Scheduler and estimator
What we did
Design-to-handover construction schedule and conceptual cost estimate for a 95 ft standard tower, checked against the FAA site budget.

Full project list available on request with our capability statement.